fushiwood@fushiwood.com

+86 137 2196 3021

Home / Application / Application

Film Faced Plywood

Clean panels carefully, using plastic or nylon tools to avid damage

Use soapy water to de-grease the surface

Repair small scratched with a suitable mastic

Fill Deeper scratches, nail and screw holes with a mastic or epoxy filler.

The building formwork is used to support the concrete pouring. After the concrete is poured and formed, the formwork can be removed. It is a kind of temporary support structure, which is made according to the design requirements, so that the concrete structure and components are generally shaped according to the specified position and geometric dimension, keep a correct position, and bear the self weight of the building formwork and the external load acting on it. The purpose of formwork engineering is to ensure the quality and safety of concrete engineering, speed up the construction progress and reduce the cost of the project.

Building formwork is actually a kind of temporary support structure, which is made according to the design requirements, so that the concrete structure and components can be shaped according to the specified relevant positions and geometric dimensions, keep the correct position of the building formwork support, and bear the self weight of the building formwork and the external load acting on it. The purpose of formwork engineering is to ensure the quality and safety of concrete engineering, speed up the construction progress and reduce the engineering cost. The main purpose of building formwork is to form and maintain the newly poured concrete, so that it can reach a certain strength to bear the self weight of the temporary structure and can be removed.

Film Faced Plywood

Chat with Us